Dockfield DRaaS 公共 AWS 恢复演示

从运行中的 AWS 环境开始。
抵达经过验证的灾难恢复环境。

用五分钟了解录制的界面。查看状态字段、选项卡、隔离时间线、被暂缓的删除、验证路径、提升关卡以及恢复后的 ECS 应用。旁白会随画面逐一说明。

AWS操作实录5 分钟12 段旁白DRaaS 旁白和字幕为英语

敏感的 AWS 账户标识已模糊处理。较长的等待已压缩,每个场景不超过 35 秒。

探索恢复策略和图示观看 11 种语言的 DR-as-Code

Press play for the five-minute Dockfield DRaaS walkthrough. English captions match the DRaaS narration.

Download the HD demo video

探索恢复生命周期

选择一个阶段,即可从该位置开始播放。

  1. 阶段 0100:15 No initial IaC baseline requiredThe next screen says: no initial infrastructure as code baseline required. Read the flow along the bottom. Production is on the left, in us-east-1. Read-only discovery and the recovery blueprint sit in the middle. The destination on the right is DR-1, in eu-west-2.
  2. 阶段 0200:35 Recovery overview and status fieldsHere is the Dockfield DRaaS interface. Across the top, the recovery record is DF-DEMO-001. Its state reads Static Scan Pending. Traffic promotion is Locked, and ARC routing is Off. Below the tabs, the Overview identifies the production source and DR-1 target. The yellow banner explains that recovery is still gated until promotion approval.
  3. 阶段 0301:00 Tier 0 artifact trust tabThe Tier Zero Trust tab is now selected. Its blue notice says no trust result is attached yet. Below it, the example command shows how to run artifact trust and attach the result to this recovery record. The trust signals name Terraform validation, Checkov, and Trivy. The note explicitly says Trivy is not proof of malware absence.
  4. 第 04 阶段01:25 Visible quarantine timelineThe Quarantine tab displays a visible timeline. At the top, the record now reads Quarantined. Traffic promotion remains Locked and ARC remains Off. The red banner confirms that promotion is disabled. The timeline lists the manual demo quarantine, the earlier Static Scan Pending entry, and the initial Discovered entry, each with a timestamp and an actor.
  5. STAGE 0501:52 Destructive change held in DRThe Destructive Changes tab shows a Delete Security Group event. Read the three fields: source event, DR action Held, and ARC Off. The detail below says the production security group was deleted, while the DR security group was retained. The action is waiting for explicit approval. The Technical details panel holds the event information for review.
  6. STAGE 0602:18 Validation path and locked failover gateThe Validation Path tab outlines Tier One infrastructure and security checks, Tier Two smoke tests, and Tier Three application and data checks. This view describes the required path; it does not display completed test results. The recording then opens ARC Traffic Control. Its failover gate is still Locked and current promotion is Not eligible. The yellow message says the ARC routing controls have not yet been configured.
  7. STAGE 0702:50 Promotion approved displayThe top status fields now change. The recovery state becomes Promotion Approved, and traffic promotion and ARC readiness both read Eligible. The green banner confirms the promotion gate has passed. Notice that the separate destructive-change event still remains Held below. Recovery promotion and approval of that deletion are distinct decisions in this interface.
  8. STAGE 0803:15 ARC traffic control readinessThe ARC Traffic Control tab now shows the lifecycle as Promotion Approved, the failover gate as Open, and current promotion as DR eligible. The yellow configuration notice remains visible. This recording shows the approval and readiness display, rather than a live ARC routing switch. The page explains that live changes stay behind the explicitly approved backend path.
  9. STAGE 0903:40 Recovery execution componentsThe recovery execution screen says: build the DR environment only after approval. Its five boxes identify the approved blueprint, DR account, eu-west-2, ECS Fargate, and health check. The text lists the components for this recorded slice: VPC, public subnets, Internet Gateway, Application Load Balancer, CloudWatch Logs, and ECS Fargate.
  10. STAGE 1004:08 Recovered application fieldsHere is the recovered application page. Its cards identify Amazon ECS as the runtime, DR-1 as the environment, and eu-west-2 as the Region. The image release is version one. Recovery mode reads Continuous Assurance. The green badge says Application Healthy. The AWS account field is blurred for this public recording. These visible labels identify the environment serving the recovered page.

DRAAS · 主要方案

持续恢复保障

持续刷新蓝图、信任检查、隔离、验证、恢复演练、证据和受控提升。

了解 DRaaS
阅读演示说明
  1. 00:00 · Live AWS to validated recovery

    Welcome to Dockfield DRaaS. The opening screen presents the journey from live AWS to validated recovery. The six boxes show the sequence: Discover, Blueprint, Quarantine, Validate, Recover, and Promote.

  2. 00:15 · No initial IaC baseline required

    The next screen says: no initial infrastructure as code baseline required. Read the flow along the bottom. Production is on the left, in us-east-1. Read-only discovery and the recovery blueprint sit in the middle. The destination on the right is DR-1, in eu-west-2.

  3. 00:35 · Recovery overview and status fields

    Here is the Dockfield DRaaS interface. Across the top, the recovery record is DF-DEMO-001. Its state reads Static Scan Pending. Traffic promotion is Locked, and ARC routing is Off. Below the tabs, the Overview identifies the production source and DR-1 target. The yellow banner explains that recovery is still gated until promotion approval.

  4. 01:00 · Tier 0 artifact trust tab

    The Tier Zero Trust tab is now selected. Its blue notice says no trust result is attached yet. Below it, the example command shows how to run artifact trust and attach the result to this recovery record. The trust signals name Terraform validation, Checkov, and Trivy. The note explicitly says Trivy is not proof of malware absence.

  5. 01:25 · Visible quarantine timeline

    The Quarantine tab displays a visible timeline. At the top, the record now reads Quarantined. Traffic promotion remains Locked and ARC remains Off. The red banner confirms that promotion is disabled. The timeline lists the manual demo quarantine, the earlier Static Scan Pending entry, and the initial Discovered entry, each with a timestamp and an actor.

  6. 01:52 · Destructive change held in DR

    The Destructive Changes tab shows a Delete Security Group event. Read the three fields: source event, DR action Held, and ARC Off. The detail below says the production security group was deleted, while the DR security group was retained. The action is waiting for explicit approval. The Technical details panel holds the event information for review.

  7. 02:18 · Validation path and locked failover gate

    The Validation Path tab outlines Tier One infrastructure and security checks, Tier Two smoke tests, and Tier Three application and data checks. This view describes the required path; it does not display completed test results. The recording then opens ARC Traffic Control. Its failover gate is still Locked and current promotion is Not eligible. The yellow message says the ARC routing controls have not yet been configured.

  8. 02:50 · Promotion approved display

    The top status fields now change. The recovery state becomes Promotion Approved, and traffic promotion and ARC readiness both read Eligible. The green banner confirms the promotion gate has passed. Notice that the separate destructive-change event still remains Held below. Recovery promotion and approval of that deletion are distinct decisions in this interface.

  9. 03:15 · ARC traffic control readiness

    The ARC Traffic Control tab now shows the lifecycle as Promotion Approved, the failover gate as Open, and current promotion as DR eligible. The yellow configuration notice remains visible. This recording shows the approval and readiness display, rather than a live ARC routing switch. The page explains that live changes stay behind the explicitly approved backend path.

  10. 03:40 · Recovery execution components

    The recovery execution screen says: build the DR environment only after approval. Its five boxes identify the approved blueprint, DR account, eu-west-2, ECS Fargate, and health check. The text lists the components for this recorded slice: VPC, public subnets, Internet Gateway, Application Load Balancer, CloudWatch Logs, and ECS Fargate.

  11. 04:08 · Recovered application fields

    Here is the recovered application page. Its cards identify Amazon ECS as the runtime, DR-1 as the environment, and eu-west-2 as the Region. The image release is version one. Recovery mode reads Continuous Assurance. The green badge says Application Healthy. The AWS account field is blurred for this public recording. These visible labels identify the environment serving the recovered page.

  12. 04:38 · DRaaS first and DR-as-Code available

    The closing screen says: DRaaS first, DR-as-Code available. The boxes recap read-only discovery, trust and quarantine, three-tier validation, recovery, and ARC-ready promotion. Visit the recovery strategies page for diagrams explaining individual AWS services, or watch the separate DR-as-Code demo in your preferred language.

免费初步咨询

您的 AWS 环境如何实现持续恢复保障?

参加免费的 30 分钟咨询,讨论工作负载、恢复目标和适合您的 DRaaS 入门路径。